Commercial service

New car park construction
in Kildare and Dublin.

Car parks in Kildare, Dublin and the neighbouring counties, built from bare ground for businesses, clubs, schools and developments: excavation, sub-base, drainage, kerbs and a machine-laid tarmac finish. Paul Delaney has 45 years in the trade.

1231New wearing course2Gullies on the falls3SMA, binder, sub-base
Illustration: a finished car park, its courses shown on the cut edges.
Delaney's Own Photos

OUR TARMAC WORK.

A long machine-laid tarmac lane running between post and rail fences
Lane Between Fences
A new tarmac lane running between grass verges and ploughed fields
Lane Between Fields
New tarmac curving along a stone wall, edged with a granite sett kerb and a planted bed
Sett Kerb Along a Wall
A curving new tarmac lane under trees beside a post and rail fence
Curving Lane
Tarmac on a slope beside a granite sett border and kerb, below a stone wall with railings
Sett Border on a Slope
A wide open tarmac forecourt finished inside a new brick boundary wall
Open Tarmac Forecourt
A narrow tarmac lane running straight between grass verges and open fields
Straight Rural Lane
Tarmac laid tight to a granite sett edge running along a stone wall
Sett Edge on a Curve
Car park construction

What sits
under the surface.

The tarmac is the thin, visible part of a new car park. What decides how long it lasts is underneath: firm formation, a sub-base deep enough for the traffic, and a route for every drop of rain to leave the surface. Paul looks at the ground first, then designs the build-up from it.

Ground checked first
Layered sub-base
Binder and SMA courses
Drainage to the permission
Kerbs set in concrete
Porous build where designed
123451Formation shaped2Drainage laid3Sub-base in layers4Binder course5SMA wearing course
Illustration: a new car park built up from the ground, course by course.
The build-up

What goes
into a car park.

Excavation

Topsoil and soft material stripped to firm ground and shaped to level.

Sub-base

Compacted stone laid and rolled in layers, with a membrane where needed.

Drainage

Falls to gullies and channels, or a porous build, to suit the permission.

Surfacing

A binder course, then an SMA wearing course, both machine-laid.

Planning

Drainage and planning conditions

A new car park adds a large hard surface, and planning permissions often set conditions on where its rainwater goes. This is known as SuDS, sustainable drainage.

  • Run-off held back on site, or sent to a soakaway or attenuation tank.
  • Porous tarmac on an open stone base where the ground suits it.
  • Falls to gullies and channels where a piped system is allowed.
  • Delaney builds to the drainage design on the permission.
A long new tarmac access road with concrete kerbs along both edges
A long tarmac access road with kerbs set along both edges.
Edges

Kerbs and edging

Kerbs hold the tarmac edge, guide water to the gullies and mark out islands and walkways.

  • Kerbs set on and backed with concrete before surfacing.
  • Dropped kerbs at crossings and accessible bays.
  • The electrical contractor places ducts for lighting or chargers before the surface goes down.
Tarmac finished against a curved granite kerb beside a gravel bed
Tarmac finished against a curved granite kerb.
Sub-base

Sub-base depth
by use.

Driveway, for comparison150 to 200mm of compacted stoneCars only, on firm ground
Car park for cars and vans250 to 300mm of compacted stoneDeeper again on soft or wet ground
Porous car parkOpen graded stone baseDepth set by the drainage design

These are trade-standard starting points. The depth for your site is set once the ground has been opened and checked.

Pricing

What decides
the price.

Area and shape of the car park
Depth of dig and ground conditions
Sub-base depth for the traffic
Drainage required by the permission
Kerbs, islands and dropped kerbs
Process

How a new
car park is built.

01

Site visit

Paul looks at the ground, levels, access and the planning conditions.

02

Written quote

Dig depth, sub-base, drainage, kerbs and surfacing set out item by item.

03

Groundworks

Strip, shape, lay drainage and set kerbs before any stone goes down.

04

Sub-base

Stone laid and rolled in layers to the agreed depth and falls.

05

Surfacing

Binder and SMA wearing courses machine-laid and rolled to the falls.

A winding tarmac lane with kerbs on both sides and a band of granite setts across it
Fresh tarmac finished inside a granite border and kerb, with a lorry and tools still on site behind
A winding tarmac run, kerbed on both sides, with a granite sett band.
Projects

Recent tarmac
projects.

Residential jobs, laid by the same crew with the same machine-laid method, sub-base and kerbing.

"The base is everything. If the sub-base is wrong, the whole thing fails inside three years."

P

Paul Delaney

Owner, Delaney Tarmac

Coverage

Commercial work
by county.

Common Questions

Common questions.

Do I need planning permission for a new car park?+

Often, particularly for a new business or community car park or a new entrance onto a public road. Check with your council or architect before booking; Delaney builds to the conditions on the permission.

Can a new car park be porous?+

Yes. Porous tarmac on an open graded stone base lets rain soak through instead of running off. Whether it suits depends on the ground and the engineer's design.

Who does the lighting and barriers?+

Electrical contractors. Where ducts and bases go is agreed with them before surfacing, so the new tarmac is not cut open later.

GET A COMMERCIAL
QUOTE.

Tell us where the site is and what it needs. A few phone photos of the surface and a rough size help Paul prepare for the site visit.

Managed by a Management Company or Agent?
Photos (up to 5)
No Obligation
Free Site Visit
Written Quote