Resurfacing replaces the worn top layer of a car park with new machine-laid tarmac. It lasts when the base underneath is still sound, so Paul checks the base before pricing. Where it has failed, that section is dug out and rebuilt, and the rest is resurfaced around it.
Cracks joining up into a map pattern across whole bays.
Repairs breaking up at their edges, winter after winter.
Water lying in the same places for hours after rain.
Stone coming off the surface and collecting at the kerbs.
Water lying on tarmac gets into cracks, freezes and breaks the surface up. A resurface is the time to put the falls right.
| Method | How it is done | Suits |
|---|---|---|
| Overlay | Surface cleaned and repaired, bond coat sprayed, new wearing course laid on top | Open car parks where kerbs, doors and gullies leave room for the extra height |
| Plane and relay | Worn surface planed off by machine, new wearing course laid at the same level | Car parks meeting buildings, footpaths or a public road |
| Partial rebuild | Failed sections dug out to the sub-base and rebuilt before either method | Car parks with soft spots, sinking bays or repeat potholes |
The quote says which method suits each area of the car park, and why.
Every car park is priced on a site visit. The written quote is built from these items.
The car park is split into sections and the order agreed before the start.
Residents, staff or customers are told which bays close on which day.
One row or area is coned off, planed or prepared, laid and rolled.
Once the tarmac has cooled the section reopens and the next one closes.
Ironwork and edges checked, site swept and signed off.
Residential jobs, laid by the same crew with the same machine-laid method, sub-base and kerbing.

Country Tarmac Driveway and Patio
A large machine-laid tarmac forecourt between brick pillars, with a sett border.
See the project
Country Entrance Tarmac Driveway
A broken entrance stripped back, the base prepared and new tarmac laid.
See the project
Tarmac Driveway with a Granite Border
Machine-laid tarmac held by a granite border and kerb.
See the project"The base is everything. If the sub-base is wrong, the whole thing fails inside three years."
Paul Delaney
Owner, Delaney Tarmac
A small car park can often be done in a day or two. A large one runs over several days, section by section, and the quote sets out the days and the order.
For most of it, yes. The work is done one section at a time, and each section reopens once the tarmac has cooled.