
Country Entrance Tarmac Driveway
A broken entrance stripped back, the base prepared and new tarmac laid.
See the projectPotholes, cracks, sunken patches and loose ironwork on car parks, estate roads, private lanes and yards. Cut back to sound edges and filled with hot tarmac by Paul Delaney's crew, 45 years in the trade.










Most potholes that come back were filled, not repaired. A bag of cold-lay tamped into the hole looks fine for a few weeks, then water gets in around the old broken edges and the patch lifts out. A lasting repair cuts back to sound tarmac, seals the joint and fills with hot material compacted to the full depth.


Cut square, cleaned out, sealed and filled hot.
Sealed before water gets in and the crack becomes a pothole.
Dips cut out and the base rebuilt before resurfacing.
Rocking frames lifted, rebedded level and tarmacked in.
A dip that holds water, or a patch that sinks more each year, means the ground below has moved.

Covers that rock, sit proud or sit low cause potholes, because traffic hammers the tarmac around the frame.

| Repair | When it suits | How it is done |
|---|---|---|
| Cold-lay | Making a hole safe until a proper repair | Material tamped into the hole; temporary only |
| Surface patch | Shallow damage, firm layers below | Top layer cut out, bond coat, hot tarmac rolled flush |
| Full-depth repair | Repeat potholes, or the surface moves under a wheel | Every failed layer dug out, base rebuilt, laid back in courses |
Each repair marked wider than the visible damage, in a square or rectangle.
Straight, vertical edges cut into sound tarmac all round.
Damaged material removed; the base checked and replaced if it has failed.
Bond coat on the base and cut faces, hot tarmac laid in layers.
Compacted flush with the surface around it and the joints sealed.
Residential jobs, laid by the same crew with the same machine-laid method, sub-base and kerbing.

Country Entrance Tarmac Driveway
A broken entrance stripped back, the base prepared and new tarmac laid.
See the project
Rural Gated Entrance Gravel Driveway
A puddled entrance rebuilt on a new base, with a granite sett apron and edging.
See the project
Tarmac Driveway with a Granite Border
Machine-laid tarmac held by a granite border and kerb.
See the project"The base is everything. If the sub-base is wrong, the whole thing fails inside three years."
Paul Delaney
Owner, Delaney Tarmac
Hot tarmac, cut in square and properly compacted, for a permanent repair. Cold-lay is a temporary fix to make a hole safe.
When repairs would cover a large share of the area, or the surface between the holes is crazed and loose. Where both are realistic, it is worth pricing both.
Yes, through the residential driveway repair service, using the same cut-and-fill method.