Commercial tarmac

Commercial tarmac contractors
in Offaly.

Business and farm yards, private lanes and community car parks across the county, on a base built for soft ground. Paul Delaney has 45 years in the trade.

123451Formation shaped2Drainage laid3Sub-base in layers4Binder course5SMA wearing course
Illustration: a surface built up from the ground, course by course.
Delaney's Own Photos

OUR TARMAC WORK.

A long new tarmac access road with concrete kerbs along both edges
Long Kerbed Lane
A winding tarmac lane with kerbs on both sides and a band of granite setts across it
Kerbs and Sett Band
Fresh tarmac finished inside a granite border and kerb, with a lorry and tools still on site behind
Granite Border and Kerb
A new tarmac lane running between grass verges and ploughed fields
Lane Between Fields
New tarmac curving along a stone wall, edged with a granite sett kerb and a planted bed
Sett Kerb Along a Wall
Tarmac on a slope beside a granite sett border and kerb, below a stone wall with railings
Sett Border on a Slope
A wide open tarmac forecourt finished inside a new brick boundary wall
Open Tarmac Forecourt
Tarmac laid tight to a granite sett edge running along a stone wall
Sett Edge on a Curve
Commercial work

The ground
decides the job.

Much of Offaly sits on soft, peaty or wet ground. Tarmac laid straight onto it sinks and cracks, so the first question on any site is what is underneath, and the base is built from the answer.

Ground opened and checked
Deeper sub-base
Membrane where needed
Yards and lanes
Community car parks
Full-depth repairs
A narrow tarmac lane running straight between grass verges and open fields
A straight tarmac lane with clean edges to the verges.
Lanes

Long private lanes

Long lanes on soft ground sink at the edges and crack along the wheel tracks. Patching the top does not hold.

  • Failed lengths dug out and the base rebuilt.
  • Edges held so the lane does not spread into the verge.
  • Water led off the lane before it soaks the base.
A curving new tarmac lane under trees beside a post and rail fence
A curving tarmac lane laid to an even width under the trees.
Ground

Base for
the ground.

Firm, free-drainingCompacted stone sub-base at the standard depth for the traffic
Soft or wetDeeper sub-base, laid and rolled in layers, with a separating membrane
Peat or very soft pocketsSoft material dug out and replaced before the sub-base

The depth for a site is set once the ground has been opened on the visit or at the start of the dig.

Pricing

What decides
the price.

Area or length to be surfaced
What the ground is like below
Sub-base depth and any membrane
Drainage off the surface
Edges and kerbs
Process

How the job
runs.

01

Ground checked

The ground opened in places to see what the base will sit on.

02

Written quote

Base depth, membrane, drainage and surface set out in full.

03

Dig and rebuild

Soft material out, stone laid and rolled in layers.

04

Machine-laid surface

Binder course and SMA wearing course laid and rolled.

05

Hand back

Edges, falls and drainage checked before sign-off.

A long machine-laid tarmac lane running between post and rail fences
Tarmac finished against a curved granite kerb beside a gravel bed
A long machine-laid lane between post and rail fences.
Projects

Recent tarmac
projects.

Residential jobs, laid by the same crew with the same machine-laid method, sub-base and kerbing.

"The base is everything. If the sub-base is wrong, the whole thing fails inside three years."

P

Paul Delaney

Owner, Delaney Tarmac

Coverage

Commercial work
by county.

Common Questions

Common questions.

Which parts of the county do you cover?+

The whole county, from the base in Newbridge.

Can tarmac be laid on boggy ground?+

Yes, once the soft material is dealt with and the sub-base is built deep enough. That is decided on site.

Do you also do driveways?+

Yes. Driveway repair and new driveways are part of the residential service.

GET A COMMERCIAL
QUOTE.

Tell us where the site is and what it needs. A few phone photos of the surface and a rough size help Paul prepare for the site visit.

Managed by a Management Company or Agent?
Photos (up to 5)
No Obligation
Free Site Visit
Written Quote