Commercial service

Car park drainage and kerbing
in Kildare and Dublin.

Standing water, blocked or broken gullies, missing channels and broken kerbs on car parks, estate roads and yards. Put right on their own or with a resurface by Paul Delaney's crew, 45 years in the trade.

GullyCleared or replaced firstCover raised to the new levelArrows show the falls
Illustration: a surface laid to fall to its gullies.
Delaney's Own Photos

OUR TARMAC WORK.

A long new tarmac access road with concrete kerbs along both edges
Long Kerbed Lane
A long machine-laid tarmac lane running between post and rail fences
Lane Between Fences
A winding tarmac lane with kerbs on both sides and a band of granite setts across it
Kerbs and Sett Band
A new tarmac lane running between grass verges and ploughed fields
Lane Between Fields
A curving new tarmac lane under trees beside a post and rail fence
Curving Lane
A wide open tarmac forecourt finished inside a new brick boundary wall
Open Tarmac Forecourt
A narrow tarmac lane running straight between grass verges and open fields
Straight Rural Lane
Drainage

Water off
the surface.

Water lying on tarmac gets into cracks, freezes and breaks the surface from below. Most car park failures start where water sits. Getting it off the surface and into a drain is the first job on any repair or resurface.

Falls corrected
Gullies cleared or replaced
Channel drains
Kerbs set in concrete
Dished crossings
Ironwork level
Tarmac on a slope beside a granite sett border and kerb, below a stone wall with railings
Tarmac on a slope with a granite sett border and kerb along the wall.
Causes

Why water
lies.

Flat falls

Settlement or a poor original lay leaves areas with no fall.

Blocked gullies

Silt and leaves fill the pot and the water backs up.

Sunken areas

A soft base lets the surface dip and hold a puddle.

Missing channels

Water runs to a door or a low corner with nowhere to go.

Kerbing

Kerbs and edging

Kerbs hold the tarmac edge, guide water to the gullies and separate cars from walkways and planting.

  • Broken and missing kerbs replaced.
  • New kerb lines for islands, walkways and bays.
  • Dished kerbs at crossings and accessible bays.
  • All set on and backed with concrete.
Tarmac finished against a curved granite kerb beside a gravel bed
Tarmac finished against a curved granite kerb.
Combined

On its own or with a resurface

Drainage and kerbing can be done as a job in its own right, but it costs less done before a resurface than after one.

  • Ponding fixed locally where the rest of the surface is sound.
  • Done first when a resurface is planned, so the new surface falls to working drains.
  • Gully and manhole covers raised to the finished level.
New tarmac curving along a stone wall, edged with a granite sett kerb and a planted bed
New tarmac following a curved stone wall, with a granite sett kerb.
Options

Drainage
options.

GullyA low point in a car park or road, piped to a drain
Channel drainAcross an entrance, along a building or a door threshold
SoakawayWhere there is no drain to connect to and the ground drains
Porous surfaceNew areas where the planning conditions call for it

Larger systems and planning conditions are designed by an engineer; Delaney builds to the design.

Pricing

What decides
the price.

Number of gullies or length of channel
Connection to an existing drain or a soakaway
Length of kerb to replace or add
Surface to cut out and reinstate
Whether it is done with a resurface
Process

How ponding
is fixed.

01

Site visit

Where water lies, where it should go and the state of every gully.

02

Find the cause

Flat falls, a blocked or broken gully, a sunken base or a missing channel.

03

Written quote

The fix for each area, with or without a resurface.

04

Drainage and kerbs

Gullies, channels and kerbs set before any surfacing.

05

Surface

Tarmac laid to fall to the drains, and the falls checked before hand-back.

Tarmac laid tight to a granite sett edge running along a stone wall
Fresh tarmac finished inside a granite border and kerb, with a lorry and tools still on site behind
Tarmac laid tight to a granite sett edge along a stone wall.
Projects

Recent tarmac
projects.

Residential jobs, laid by the same crew with the same machine-laid method, sub-base and kerbing.

"The base is everything. If the sub-base is wrong, the whole thing fails inside three years."

P

Paul Delaney

Owner, Delaney Tarmac

Coverage

Commercial work
by county.

Common Questions

Common questions.

Can a soakaway be used instead of a drain connection?+

Where there is no drain to connect to and the ground drains well, yes. On heavy clay or wet ground it usually is not suitable.

Do you design drainage systems?+

Delaney fits gullies, channels and soakaways on straightforward sites. Larger systems are designed by an engineer, and Delaney builds to the design.

GET A COMMERCIAL
QUOTE.

Tell us where the site is and what it needs. A few phone photos of the surface and a rough size help Paul prepare for the site visit.

Managed by a Management Company or Agent?
Photos (up to 5)
No Obligation
Free Site Visit
Written Quote