See the projectStanding water, blocked or broken gullies, missing channels and broken kerbs on car parks, estate roads and yards. Put right on their own or with a resurface by Paul Delaney's crew, 45 years in the trade.







Water lying on tarmac gets into cracks, freezes and breaks the surface from below. Most car park failures start where water sits. Getting it off the surface and into a drain is the first job on any repair or resurface.

Settlement or a poor original lay leaves areas with no fall.
Silt and leaves fill the pot and the water backs up.
A soft base lets the surface dip and hold a puddle.
Water runs to a door or a low corner with nowhere to go.
Kerbs hold the tarmac edge, guide water to the gullies and separate cars from walkways and planting.

Drainage and kerbing can be done as a job in its own right, but it costs less done before a resurface than after one.

| Option | Where it suits |
|---|---|
| Gully | A low point in a car park or road, piped to a drain |
| Channel drain | Across an entrance, along a building or a door threshold |
| Soakaway | Where there is no drain to connect to and the ground drains |
| Porous surface | New areas where the planning conditions call for it |
Larger systems and planning conditions are designed by an engineer; Delaney builds to the design.
Where water lies, where it should go and the state of every gully.
Flat falls, a blocked or broken gully, a sunken base or a missing channel.
The fix for each area, with or without a resurface.
Gullies, channels and kerbs set before any surfacing.
Tarmac laid to fall to the drains, and the falls checked before hand-back.


Residential jobs, laid by the same crew with the same machine-laid method, sub-base and kerbing.

Rural Gated Entrance Gravel Driveway
A puddled entrance rebuilt on a new base, with a granite sett apron and edging.
See the project
Tarmac Driveway with a Granite Border
Machine-laid tarmac held by a granite border and kerb.
See the project
Country Entrance Tarmac Driveway
A broken entrance stripped back, the base prepared and new tarmac laid.
See the project"The base is everything. If the sub-base is wrong, the whole thing fails inside three years."
Paul Delaney
Owner, Delaney Tarmac
Where there is no drain to connect to and the ground drains well, yes. On heavy clay or wet ground it usually is not suitable.
Delaney fits gullies, channels and soakaways on straightforward sites. Larger systems are designed by an engineer, and Delaney builds to the design.